Nigeria’s drive for a stronger, extra dependable vitality sector acquired a lift because the African Improvement Financial institution (AfDB) introduced a $1.2 million grant to launch the Battery Power Storage System (BESS) Feasibility Examine.
The AfDB Nigeria Nation Workplace director common, Dr. Abdul Kamara, who made this identified in Abuja, additionally affirmed the financial institution’s dedication to supporting Nigeria’s vitality reforms.
Talking on the examine’s inauguration of the Feasibility Examine on the BESS, on Wednesday, Dr. Kamara, who was represented by Chigozie Egerue, of the financial institution’s Africa Power Transition Catalyst Programme, underscored the urgency of addressing Nigeria’s electrical energy entry hole.
“That is why the financial institution has dedicated a 1.2-million-dollar grant underneath the Africa Power Transition Catalyst Programme to help this feasibility examine.”
“The mission to bridge the vitality hole is extra pressing than in Nigeria, house to an estimated 90 million folks nonetheless with out entry to electrical energy.” Dr. Kamara declared.
The mission, applied by the Transmission Firm of Nigeria (TCN), will consider grid integration potential, enterprise and regulatory fashions for funding, and capacity-building measures important for possession and sustainability.
Dr. Kamara harassed that battery storage “is now not a luxurious; it’s a necessity.” He defined that as Nigeria’s energy grid modernises, battery storage will likely be essential for “frequency stabilisation, reserve capability, and peak load administration.” Nonetheless, he warned, “Expertise alone is not going to carry the day. Regulatory frameworks and funding environments should evolve to scale improvements sustainably.”
As Nigeria aligns with the Mission 300 initiative, focusing on electrical energy connection for 300 million folks throughout Africa by 2030, battery storage is rising as a “vital enabler.” Citing the continent’s sources, the AfDB consultant highlighted, “Africa holds virtually 60 per cent of the world’s greatest photo voltaic sources, but accounts for less than two per cent of worldwide vitality storage capability.”
Past the BESS feasibility examine, AfDB’s dedication to Nigeria’s vitality sector is substantial. “$500 million has already been disbursed, with the second section on observe,” Dr. Kamara restated, referring to the $1 billion Financial Governance and Power Transition Help Programme. The financial institution’s $1 million Africa Power Sector Technical Help Programme can be serving to implement the Electrical energy Act, develop state-level energy markets, and strengthen governance.
“Nigeria can be a key nation underneath our flagship’s $20 billion Desert to Energy Initiative, which goals to generate 10,000 megawatts of photo voltaic throughout the Sahel and supply energy to 250 million folks. This holds immense promise for Nigeria’s clear vitality future,” Dr. Kamara defined.
He mentioned it offered “not only a problem however a chance,” with additional examples of battery storage success in South Africa and Kenya reaffirming the know-how’s transformative potential.
In his tackle, Minister of Energy Chief Adebayo Adelabu, emphasised the examine’s strategic significance: “The feasibility examine is not only a technical train however a strategic step in the direction of additional proving Nigeria’s energy infrastructure.”
The minister, represented by the ministry’s assistant director of Renewable Power, Engr. Ben Anyagwu, mirrored on the sector’s ongoing reforms whereas acknowledging persisting challenges: “With the rising penetration of photo voltaic and wind vitality in our vitality combine, we should now tackle the vital problem of vitality storage: storing electrical energy when technology exceeds demand and dispatching it when wanted to take care of steadiness and reliability.”
He famous that BESS may “improve grid stability and suppleness, cut back reliance on fossil-fuel-based peaking crops, allow deeper integration of renewables into each grid-connected and off-grid methods, and enhance energy high quality and system reliability—particularly throughout voltage or frequency disturbances. Finally, it will assist prolong entry to scrub vitality in underserved and distant areas.”
The managing director of TCN, Engr. Sule Abdulaziz, targeted on the technical constraints: “For years, the challenges have been frequency fluctuations, peak load pressures, and limitations in reactive energy help. These technical constraints have an effect on each layer of the worth chain.”
Abdulaziz, who was represented by the TCN’s government director, Transmission System Operation Olugbenga Ajiboye, mentioned the technical constraints affected each worth chain layer.
He affirmed that Battery Power Storage Programs “supply Nigeria a robust means to deal with the persistent challenges,” enabling “regulation, reserve capability, and voltage help,” which might instantly strengthen grid efficiency and maximise use of current belongings.
We’ve acquired the sting. Get real-time stories, breaking scoops, and unique angles delivered straight to your telephone. Don’t accept stale information. Be part of LEADERSHIP NEWS on WhatsApp for twenty-four/7 updates →