Close Menu
    Trending
    • Tinubu tells World Bank Nigeria will not reverse course on economic reforms
    • Cancer: Bridging the survival gap
    • Wike: No more ‘vagabonds’ in PDP; they’ve been expelled  —  Makinde
    • Boy swims 2.5 miles to save mom, siblings swept out to sea: “Superhuman”
    • Collision between Greek coastguard vessel, migrant boat kills at least 14 | Migration News
    • Cute Abiola denies shading Kunle Afolayan over controversial comment about Funke Akindele
    • Kim Kardashian And Lewis Hamilton Spark Romance Rumors
    • Tammy Abraham wanted to play for Nigeria but changed his mind – Pinnick 
    Nigeria Newz
    • Home
    • Nigeria News
    • Nigeria Politics
    • Africa News
    • World News
    • US News
    • Nigeria Lifestyle
    • More
      • Nigeria Business
      • Nigeria Economy
      • Entertainment
      • Nollywood Movies
      • Relationship
      • Soccer
      • Sports
      • Travel News
    Nigeria Newz
    Home»US News»Artemis II moon rocket fueling test runs into problems with hydrogen leak
    US News

    Artemis II moon rocket fueling test runs into problems with hydrogen leak

    NigeriaNewzBy NigeriaNewzFebruary 2, 2026No Comments4 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Follow Us
    Google News Flipboard
    Share
    Facebook Twitter LinkedIn Pinterest Email


    A hydrogen leak on the base of NASA’s Artemis II moon rocket on Monday threw a wrench right into a rigorously deliberate countdown “moist costume” rehearsal, interrupting a check meant to assist clear the best way towards a attainable weekend launch for four astronauts on a flight across the moon. 

    The follow countdown started Saturday night — two days late due to frigid weather alongside Florida’s House Coast — and after a gathering Monday morning to evaluate the climate and the staff’s readiness to proceed, launch director Charlie Blackwell-Thompson cleared engineers to start the remotely managed fueling operation.

    NASA’s House Launch System rocket stands atop pad 39B on the Kennedy House Middle. Engineers started work early Monday to pump greater than 750,000 gallons of supercold liquid oxygen and hydrogen gas into the 32-story-tall rocket in a costume rehearsal countdown to clear the best way for launch.

    NASA


    The check obtained underway about 45 minutes later than deliberate, but it surely initially seemed to be continuing easily as supercold liquid oxygen and hydrogen gas had been pumped into the House Launch System rocket’s first-stage tanks. Shortly after, hydrogen started flowing into the rocket’s higher stage as deliberate.

    However after the first-stage hydrogen tank was about 55% full, a leak was detected at an umbilical plate the place a gas line from the launch pad is related to the SLS rocket’s first stage. After a short pause, engineers resumed gas circulation however once more minimize it off with the tank about 77% full.

    After extra dialogue, they determined to press forward to seek out out whether or not the leak would lower as anticipated as soon as the tank was full and in a replenishment mode when circulation charges are diminished.

    It was not instantly identified how a lot the leakage exceeded NASA security margins or what troubleshooting steps had been initially carried out. Liquid oxygen loading of the primary stage continued all through and reached full capability of 196,000 gallons.

    The countdown was timed for a simulated launch at 9 p.m. ET. Engineers initially deliberate to proceed a number of hours previous that to run by a number of recycle procedures meant to ensure the staff is able to deal with any issues and delays that may crop up throughout an actual countdown. How the leak would possibly have an effect on these plans was not instantly identified.

    The SLS is the rocket NASA plans to make use of to ship Artemis astronauts to the moon aboard Orion crew capsules. It’s the strongest operational launcher on this planet, a towering 332-foot-tall rocket powered by two strap-on stable gas boosters and 4 most important engines burning liquid oxygen and hydrogen gas that generate 8.8 million kilos of thrust at liftoff.

    Artemis II commander Reid Wiseman, Victor Glover, Christina Koch and Jeremy Hansen are hoping to launch atop the SLS rocket as early as Sunday night time for a nine-day, two-hour flight across the moon and again. However solely three days in February are nonetheless attainable: Feb. 8, 10 and 11. If the SLS is not off the bottom by Feb. 11, the flight will slip to early March.

    The SLS rocket’s first and thus far solely mission got here in 2022 when it was launched on an unpiloted check flight. Within the marketing campaign main as much as launch, engineers bumped into a wide range of issues starting from gas leaks to sudden propellant circulation habits within the launch pad’s plumbing. Launch was delayed for months whereas engineers labored to resolve the issues.

    For the rocket’s second launch, a number of upgrades and enhancements had been applied, and Blackwell-Thompson mentioned she was optimistic the fueling check would go effectively.

    “Why do we predict that we’ll achieve success? It is the teachings that we realized,” she mentioned final week.

    “Artemis I used to be the check flight, and we realized so much throughout that marketing campaign, attending to launch,” she mentioned. “And the issues that we realized relative to how one can go load this automobile, how one can load LOX (liquid oxygen), how one can load hydrogen, have all been rolled in to the best way through which we intend to load the Artemis II automobile.”

    However the gas leak threw the staff delayed, and it wasn’t clear how far the check would possibly proceed even when engineers had been capable of efficiently handle the hydrogen leak.

    Go deeper with The Free Press

    In:



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    NigeriaNewz
    • Website

    Related Posts

    Boy swims 2.5 miles to save mom, siblings swept out to sea: “Superhuman”

    February 4, 2026

    “48 Hours” – About Us – CBS News

    February 3, 2026

    Government shutdown live updates as House approves funding package, ending standoff

    February 3, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Economy News

    NPFL: Coach Mohammed pleased with Katsina United’s performance in win over Wikki

    By NigeriaNewzSeptember 23, 2025

    Katsina United head coach Azeez Mohammed has counseled his gamers for sticking to the sport…

    Does quitting your job really solve your financial issues?

    September 7, 2025

    ‘Training Africa’s AI generation: Why skills, not silicon, will shape the future’

    November 1, 2025

    South Africa vs Nigeria: World Cup qualifier – start, team news and lineups | Football News

    September 8, 2025

    1/7: The Takeout with Major Garrett

    January 8, 2026
    Categories
    • Africa News
    • Entertainment
    • Nigeria Business
    • Nigeria Economy
    • Nigeria Lifestyle
    • Nigeria News
    • Nigeria Politics
    • Nollywood Movies
    • Relationship
    • Soccer
    • Sports
    • Travel News
    • US News
    • World News
    About us

    Welcome to Nigerianewz.com — your trusted source for the latest and most comprehensive news about Nigeria, Africa, and the world.

    At Nigerianewz.com, we are passionate about keeping you informed with up-to-date, accurate, and insightful news coverage across a wide range of topics that matter to you. Whether you want to catch up on Nigeria Politics, get breaking Africa News, or stay updated on global happenings through our US News and World News sections, we’ve got you covered.

    Our mission is to connect you with authentic stories, powerful voices, and engaging content that reflects the dynamism of Nigeria and the broader African continent. Nigerianewz.com is designed to be your go-to platform for everything happening at home and around the globe.

    Thank you for choosing Nigerianewz.com — where news lives, breathes, and speaks to you.

    Recent Posts

    25 000 figurines sont réunies dans une expo

    January 6, 2026

    Adefarasin calls for national unity

    December 5, 2025

    Consumer Commission Fixes January 5 As Compliance Deadline

    November 14, 2025

    DLM Funding SPV opens N30bn sovereign-backed composite notes

    July 3, 2025

    Immediate past Kwara PDP Chairman defects to ADC

    October 18, 2025
    Categories
    • Africa News
    • Entertainment
    • Nigeria Business
    • Nigeria Economy
    • Nigeria Lifestyle
    • Nigeria News
    • Nigeria Politics
    • Nollywood Movies
    • Relationship
    • Soccer
    • Sports
    • Travel News
    • US News
    • World News
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us
    Copyright © 2025 Nigerianewz.com All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.